SOUTH MAPLE STREET over SCANTIC RIVER

1750 FT SOUTH OF RTE 190 · County 003, Connecticut · Built 2010 · 2 Lanes · 2,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
03972
Year Built
2010
Length
26.2 m (86 ft)
Max Span
25.6 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
2,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A