RECREATION PARK ST over LITTLE RIVER

1/8 MILE EAST OF SABIN ST · County 015, Connecticut · Built 2020 · 2 Lanes · 803 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
03968
Year Built
2020
Length
12.4 m (40.7 ft)
Max Span
11.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
803
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$3,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.