ROUTE 40 SB over ROUTE 10

3MI NORTHOF INTERSTATE 91 · County 009, Connecticut · Built 1976 · 1 Lanes · 8,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
03835
Year Built
1976
Length
38.1 m (125 ft)
Max Span
36.6 m
Width
11.5 m (37.7 ft)
Lanes
1
Daily Traffic
8,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.