SR 642 over YANTIC RIVER

1.7 MI WEST OF ROUTE 32 · County 011, Connecticut · Built 1938 · 2 Lanes · 8,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03799
Year Built
1938
Reconstructed
2003
Length
26.2 m (86 ft)
Max Span
24.4 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
8,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.