NORTH MAIN STREET over HOCKANUM RIVER

0.6 MI WEST OF JCT RTE 83 · County 003, Connecticut · Built 2001 · 2 Lanes · 7,100 vehicles/day

Overall
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
03793
Year Built
2001
Length
18.3 m (60 ft)
Max Span
8.5 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
7,100
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.