ROUTE 8 NORTHBOUND over CAPITOL AVENUE

2.4 MILES NORTH OF I-95 · County 001, Connecticut · Built 1972 · 4 Lanes · 41,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
03765
Year Built
1972
Reconstructed
2016
Length
30 m (98.4 ft)
Max Span
27.7 m
Width
21.8 m (71.5 ft)
Lanes
4
Daily Traffic
41,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.