SACKETT POINT ROAD over QUINNIPIAC RIVER

0.6 MI E OF US ROUTE 5 · County 009, Connecticut · Built 2024 · 2 Lanes · 10,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
03743
Year Built
2024
Length
50.1 m (164.4 ft)
Max Span
25 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
10,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$15,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.