NORTH MAIN STREET over WEST BRANCH TROUT BROOK

0.3 MILE NORTH OF FERN ST · County 003, Connecticut · Built 1901 · 3 Lanes · 15,660 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03651
Year Built
1901
Reconstructed
2022
Length
15.5 m (50.9 ft)
Max Span
4.6 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
15,660
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$1,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.