INTERSTATE 684 NB over BYRAM RIVER

BETWEEN EXITS 2 & 3 · County 001, Connecticut · Built 1968 · 3 Lanes · 35,050 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
03514
Year Built
1968
Length
18 m (59.1 ft)
Max Span
17.5 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
35,050
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$3,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.