SOUTH ROAD over ROUTE 9 SOUTHBOUND

SOUTH OF FARMINGTON STACK · County 003, Connecticut · Built 1969 · 2 Lanes · 4,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
03482
Year Built
1969
Length
85.7 m (281.2 ft)
Max Span
32.8 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
4,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.