KENNEDY DRIVE over I-395 & I-395 RAMP 061

INTERSTATE 395 AT EXIT 45 · County 015, Connecticut · Built 1967 · 2 Lanes · 8,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03472
Year Built
1967
Reconstructed
1993
Length
80.5 m (264.1 ft)
Max Span
40.2 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
8,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.