INTERSTATE-395 NB over ROUTE 101

2.72 MI SO OF PUTNAM TL · County 015, Connecticut · Built 1967 · 2 Lanes · 13,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
03458
Year Built
1967
Reconstructed
1993
Length
32.3 m (106 ft)
Max Span
30.5 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
13,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.