ROUTE 9 SOUTHBOUND over TURKEY HILL ROAD

0.6 MI N OF ROUTE 82 · County 007, Connecticut · Built 1967 · 2 Lanes · 15,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03440
Year Built
1967
Length
40.2 m (131.9 ft)
Max Span
18.6 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
15,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.