ROUTE 2A over GALLIVAN LANE

0.5 MI E OF I-395 · County 011, Connecticut · Built 1967 · 5 Lanes · 35,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03423
Year Built
1967
Reconstructed
1996
Length
51 m (167.3 ft)
Max Span
23.2 m
Width
30.9 m (101.4 ft)
Lanes
5
Daily Traffic
35,900
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.