ROUTE 9 NORTHBOUND over HUBBARD ROAD

1.0 MI S OF ROUTE 81 · County 007, Connecticut · Built 1966 · 3 Lanes · 14,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03380
Year Built
1966
Length
31.1 m (102 ft)
Max Span
30.1 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
14,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.