ROUTE 9 SOUTHBOUND over CANDLEWOOD HILL RD & BRK

0.5 MI W. OF ROUTE 154 · County 007, Connecticut · Built 1965 · 2 Lanes · 17,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03288
Year Built
1965
Length
48.2 m (158.1 ft)
Max Span
23.2 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
17,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.