ROUTE 8 NORTHBOUND over ROUTE 8 SB & LOCAL ROADS

ROUTE 8 SOUTH OF I-84 · County 009, Connecticut · Built 1966 · 2 Lanes · 30,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
03190A
Year Built
1966
Reconstructed
1991
Length
802.8 m (2633.9 ft)
Max Span
35.1 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
30,400
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$11,097,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.