ROUTE 8 NORTHBOUND over ROUTE 8 SB & LOCAL ROADS
ROUTE 8 SOUTH OF I-84 · County 009, Connecticut · Built 1966 · 2 Lanes · 30,400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
41.545983, -73.044464
This bridge is in worse condition than 96.4% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 60 years old.
Nearby Bridges
ROUTE 8 RAMP 077 over BANK STREET
Built 1965
ROUTE 8 NORTHBOUND over BANK & S.LEONARD STREETS
Built 1966
ROUTE 8 SOUTHBOUND over BANK & S.LEONARD STREETS
Built 1965
BANK STREET over NAUGATUCK RIVER
Built 1956
ROUTE 8 NORTHBOUND over WASHINGTON AVENUE
Built 1965
ROUTE 8 SOUTHBOUND over WASHINGTON AVENUE
Built 1965
ROUTE 8 SOUTHBOUND over PORTER STREET
Built 1965
ROUTE 8 NORTHBOUND over PORTER STREET
Built 1965
WASHINGTON AVE #3 over NAUGATUCK RIVER
Built 1956
ROUTE 8 SB over RIVERSIDE STREET SB
Built 1965
Bridge Details
- Structure #
- 03190A
- Year Built
- 1966
- Reconstructed
- 1991
- Length
- 802.8 m (2633.9 ft)
- Max Span
- 35.1 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 30,400
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $11,097,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.