I-91 NB RAMP 016 over LITTLE RIVER

I-91 NB EXIT NO 8 · County 009, Connecticut · Built 1965 · 1 Lanes · 16,600 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
03095
Year Built
1965
Length
14.9 m (48.9 ft)
Max Span
7.3 m
Lanes
1
Daily Traffic
16,600
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.