INTERSTATE 84 EB over POOTATUCK RIVER

.5 MILE BEFORE EXIT 11 · County 001, Connecticut · Built 1973 · 3 Lanes · 38,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
02953
Year Built
1973
Length
39.3 m (128.9 ft)
Max Span
37.8 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
38,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.