I-95 NB TR 819 over SR 641

0.2 MI N OF ROUTE 32 · County 011, Connecticut · Built 1975 · 1 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
02864
Year Built
1975
Length
36.2 m (118.8 ft)
Max Span
34.4 m
Width
12.7 m (41.7 ft)
Lanes
1
Daily Traffic
7,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.