ROUTE 34 over HALFWAY RIVER

AT THE MONROE NEWTOWN TL. · County 001, Connecticut · Built 1963 · 2 Lanes · 8,000 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01842
Year Built
1963
Length
11.9 m (39 ft)
Max Span
5.8 m
Width
65.8 m (215.9 ft)
Lanes
2
Daily Traffic
8,000
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.