INTERSTATE-691 EB over ROUTE 15

02 MI WEST EXIT ROUTE 15 · County 009, Connecticut · Built 1965 · 2 Lanes · 22,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01826
Year Built
1965
Reconstructed
2014
Length
57.9 m (190 ft)
Max Span
29.6 m
Width
16.9 m (55.4 ft)
Lanes
2
Daily Traffic
22,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.