INTERSTATE-95 NB over ROUTE 49

I-95 EXIT NO. 92 · County 011, Connecticut · Built 1964 · 2 Lanes · 13,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
01812
Year Built
1964
Length
40.1 m (131.6 ft)
Max Span
19.4 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
13,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.