INTERSTATE-95 SB over ROUTE 27

0.4 MI N OF MYSTIC RIVER · County 011, Connecticut · Built 1964 · 3 Lanes · 26,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
01792
Year Built
1964
Length
45.1 m (148 ft)
Max Span
19.5 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
26,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.