INTERSTATE-84 EB over BERKSHIRE ROAD

0.7 MI E OF FARMINGTON TL · County 003, Connecticut · Built 2022 · 4 Lanes · 63,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
01744
Year Built
2022
Length
35.6 m (116.8 ft)
Max Span
32.6 m
Width
23.1 m (75.8 ft)
Lanes
4
Daily Traffic
63,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$4,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.