ROUTE 8 NORTHBOUND over ECHO LAKE ROAD

1.9 MI NORTH WATERBURY LN · County 005, Connecticut · Built 1964 · 2 Lanes · 15,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01726
Year Built
1964
Reconstructed
2004
Length
38.4 m (126 ft)
Max Span
18.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
15,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.