NORTH MAIN STREET over POLAND RIVER

100 FT WEST OF RTE 72 · County 005, Connecticut · Built 2017 · 2 Lanes · 2,809 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01670
Year Built
2017
Length
12.7 m (41.7 ft)
Max Span
11.4 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
2,809
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$1,706,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.