SR 710 over FULLING MILL BROOK

0.04 MI SO. OF EXIT 28 SB · County 009, Connecticut · Built 1998 · 2 Lanes · 3,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01657
Year Built
1998
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
3,500
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.