I-95 RAMP 313 over AMTRAK RAILROAD

I-95 EXIT NO. 85 · County 011, Connecticut · Built 1943 · 4 Lanes · 10,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
01639
Year Built
1943
Reconstructed
2001
Length
42.9 m (140.7 ft)
Max Span
20.8 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
10,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.