ROUTE 213 over AMTRAK RAILROAD

0.4 MI S OF ROUTE 156 · County 011, Connecticut · Built 1960 · 2 Lanes · 4,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01552
Year Built
1960
Length
45.3 m (148.6 ft)
Max Span
16.8 m
Width
16.4 m (53.8 ft)
Lanes
2
Daily Traffic
4,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.