ROUTE 137 over RIPPOWAM RIVER

0.1 MI NORTH OF ROUTE 15 · County 001, Connecticut · Built 2023 · 5 Lanes · 14,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01350
Year Built
2023
Length
22.1 m (72.5 ft)
Max Span
20.3 m
Width
22.4 m (73.5 ft)
Lanes
5
Daily Traffic
14,900
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$4,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.