INTERSTATE-84 EB over PIERPONT ROAD

.8 MI WEST OF CHESHIRE TL · County 009, Connecticut · Built 2006 · 2 Lanes · 50,850 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01229A
Year Built
2006
Length
18.9 m (62 ft)
Max Span
17.1 m
Width
19.1 m (62.7 ft)
Lanes
2
Daily Traffic
50,850
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.