INTERSTATE 84 WB over US RTE 6 RTE 67 STREAM

I-84 WB EXIT NO. 15 · County 009, Connecticut · Built 1963 · 2 Lanes · 30,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
01156
Year Built
1963
Reconstructed
2018
Length
69.2 m (227 ft)
Max Span
28.7 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
30,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,080,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.