ROUTE 74 over SKUNGAMAUG RIVER

1.8 MILES WEST OF I-84 · County 013, Connecticut · Built 2024 · 2 Lanes · 2,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
01120
Year Built
2024
Length
19 m (62.3 ft)
Max Span
18.6 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
2,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.