ROUTE 34 over METRO NORTH RAILROAD

0.1 MI E OF ROUTE 8 · County 009, Connecticut · Built 1951 · 5 Lanes · 33,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00946
Year Built
1951
Reconstructed
1996
Length
13.4 m (44 ft)
Max Span
12.5 m
Width
28.7 m (94.2 ft)
Lanes
5
Daily Traffic
33,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.