INTERSTATE 84 WB over ROUTE 25

EXIT 9 INTERSTATE-84 · County 001, Connecticut · Built 1962 · 3 Lanes · 39,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00898
Year Built
1962
Reconstructed
1993
Length
42.7 m (140.1 ft)
Max Span
21 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
39,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.