ROUTE 22 over ROUTE 15

AT EXIT 63 OF ROUTE 15 · County 009, Connecticut · Built 1947 · 4 Lanes · 14,800 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00788
Year Built
1947
Reconstructed
1988
Length
33.2 m (108.9 ft)
Max Span
14.9 m
Width
18.8 m (61.7 ft)
Lanes
4
Daily Traffic
14,800
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.