WOODIN STREET over ROUTE 15

2.3 MI S OF ROUTE 10 · County 009, Connecticut · Built 1949 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00775
Year Built
1949
Reconstructed
1990
Length
45.1 m (148 ft)
Max Span
21.9 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
6,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.