CLINTON AVENUE over ROUTE 15

RT 15 BETWEEN EXITS 41&42 · County 001, Connecticut · Built 1940 · 2 Lanes · 1,865 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00729
Year Built
1940
Length
31.4 m (103 ft)
Max Span
27.3 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,865
Material
Steel
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.