ROUTE 14 over MERRICK BROOK

.1 MILE WEST OF ROUTE 97 · County 015, Connecticut · Built 2020 · 2 Lanes · 4,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
00681
Year Built
2020
Length
17.7 m (58.1 ft)
Max Span
16.7 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
4,800
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.