ROUTE 8 NORTHBOUND over NAUGATUCK RIVER & RR

1.0 MI N OF CAMPVILLE RD · County 005, Connecticut · Built 1960 · 2 Lanes · 12,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00608
Year Built
1960
Reconstructed
2017
Length
213.7 m (701.1 ft)
Max Span
48.8 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
12,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.