INTERSTATE-95 SB over OIL MILL ROAD

0.7 MI EST OF US ROUTE 1 · County 011, Connecticut · Built 1958 · 2 Lanes · 22,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00352B
Year Built
1958
Reconstructed
2017
Length
14.1 m (46.3 ft)
Max Span
13.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
22,600
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.