INTERSTATE-395 over MAPLE AVENUE

0.3 MI S OF ROUTE 163 · County 011, Connecticut · Built 1958 · 4 Lanes · 49,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00262
Year Built
1958
Reconstructed
1996
Length
18.1 m (59.4 ft)
Max Span
16.6 m
Width
31.6 m (103.7 ft)
Lanes
4
Daily Traffic
49,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.