MILLER POND ROAD over INTERSTATE-395

1.8 MI N OF ROUTE 85 · County 011, Connecticut · Built 1957 · 2 Lanes · 138 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00258
Year Built
1957
Length
48.8 m (160.1 ft)
Max Span
24.1 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
138
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.