INTERSTATE-95 over ROUTE 161
0.4 MI S OF US ROUTE 1 · County 011, Connecticut · Built 1958 · 5 Lanes · 59,100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.360775, -72.209792
This bridge is in worse condition than 95.2% of bridges in County 011. The average bridge in Connecticut is 0 years old; this one is 68 years old.
Nearby Bridges
INDUSTRIAL PARK RD over PATTAGANSETT RIVER
Built 1968
US ROUTE 1 over LATIMER BROOK
Built 1984
INTERSTATE-95 over LATIMERS BROOK
Built 1958
US ROUTE 1 over PATTAGANSETT RIVER
Built 2017
EGRET ROAD over LATIMER BROOK
Built 2005
US ROUTE 1 (Boston over INTERSTATE-95
Built 1958
US ROUTE 1 over LATIMERS BROOK
Built 1985
US ROUTE 1 over NIANTIC RIVER
Built 2017
INTERSTATE-95 SB over INTERSTATE-395 NB
Built 1958
INTERSTATE-95 NB over OIL MILL ROAD
Built 1958
Bridge Details
- Structure #
- 00250
- Year Built
- 1958
- Length
- 32.4 m (106.3 ft)
- Max Span
- 29.6 m
- Width
- 28.6 m (93.8 ft)
- Lanes
- 5
- Daily Traffic
- 59,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $112,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.