FOUR MILE RIVER RD over INTERSTATE-95

5.5 MI N OF ROUTE 9 · County 011, Connecticut · Built 1958 · 2 Lanes · 5,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00246
Year Built
1958
Reconstructed
2015
Length
46 m (150.9 ft)
Max Span
22.2 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
5,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.