WILLARD AVENUE over INTERSTATE-95

2.0 MI N OF ROUTE 145 · County 007, Connecticut · Built 1958 · 2 Lanes · 2,480 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00230
Year Built
1958
Reconstructed
2022
Length
54.7 m (179.5 ft)
Max Span
17.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
2,480
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.