ROUTE 81 over INTERSTATE-95

I-95 EXIT NO. 63 · County 007, Connecticut · Built 1957 · 4 Lanes · 13,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00222
Year Built
1957
Reconstructed
1989
Length
47.5 m (155.8 ft)
Max Span
22.9 m
Width
18.6 m (61 ft)
Lanes
4
Daily Traffic
13,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.