INTERSTATE-95 over EAST RIVER

2.3 MI S OF ROUTE 79 · County 009, Connecticut · Built 1957 · 4 Lanes · 54,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00210
Year Built
1957
Reconstructed
1998
Length
50.5 m (165.7 ft)
Max Span
24.4 m
Width
31.6 m (103.7 ft)
Lanes
4
Daily Traffic
54,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.