INTERSTATE-95 over BRANFORD RIVER

0.6 MI S OF US ROUTE 1 · County 009, Connecticut · Built 1958 · 4 Lanes · 70,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
00195
Year Built
1958
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Lanes
4
Daily Traffic
70,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.